The post holes are dug for the new walkway for the pool.
|
|
|
|
The back walkway before tearing up the old, rotten wood.
|
|
|
|
Preparing the back walkway for cement pour.
|
|
|
|
Framing for the deck around the gazebo.
|
|
|
|
Poolside with everything ripped out.
|
|
|
|
|
Poolside - starting to take shape.
|
|
|
|
All the sprinkler pipes and controls are repositioned.
|
|
|
|
Walkway to the pool starts to take shape.
|
|
|
|
The pool walkway meets the gazebo decking.
|
|
|
|
New block wall in place and forms for cement in place.
|
|
|
|
|
The decking around the gazebo looks good.
|
|
|
|
The new patterned concrete near the pool.
|
|
|
|
The very large bridge footing on the far side of the arroyo.
|
|
|
|
The bridge footing for the near (pool) side of the arroyo.
|
|
|
|
The new connecting walkway seen from the pool.
|
|
|
|
|
The new poolside block wall and steps to the bridge.
|
|
|
|
Another view of the new block wall and steps to the bridge.
|
|
|
|
The new walkway goes around the gazebo to the pool walkway.
|
|
|
|
Another view of the stamped concrete and new wall.
|
|
|
|
The pool walkway now connects to the gazebo decking.
|
|
|
|
|
The new ramp leads up to the gazebo deck.
|
|
|
|
Newly poured and stamped back sidewalk.
|
|
|
|
The walkway connecting the gazebo decking to the pool walkway.
|
|
|
|
A view of the gazebo deck taken from the new ramp.
|
|
|
|
The new Bar Decking area next to the gazebo.
|
|
|
|
|
Good view of the connecting walkways.
|
|
|
|
The swimming pool needs cleaning after all the construction.
|
|
|
|
The walkway/ramp to the gazebo with the new hand rails.
|
|
|
|
The new concrete - stamped and sealed. Looks great!
|
|
|
|
A view of the new ramp with recently-built handrail.
|
|
|
|
|
The new handrail on the gazebo deck.
|
|
|
|
Another view of the new handrail up to the gazebo deck.
|
|
|
|
Some of the bridge kit near the construction area.
|
|
|
|
The newly-arrived bridge beams are carried over the gorge. Whew!
|
|
|
|
The bridge beams are now partially braced with cross braces.
|
|
|
|
|
The beams are all braced except the center. I made some for there.
|
|
|
|
Some of the decking planks are getting stained too.
|
|
|
|
The beams are fully braced and freshly stained. Ready for decking.
|
|
|
|
The bridge (now stained) showing the cross-bracing. Strong!
|
|
|
|
All the decking is down and I started the handrail assembly.
|
|
|
|
|
All the decking 2x6's are finally in place. The bridge is now very rigid and strong.
|
|
|
|
A view from the pool side of the bridge. Partial handrails.
|
|
|
|
A view from the other side towards the pool.
|
|
|
|
The bridge is finally completed and freshly stained. View from the gorge.
|
|
|
|
The completed bridge as viewed from the other side of the pool.
|
|
|
|
|
A view to the fruit trees. Doesn't look like 20-feet (but it IS).
|
|
|
|
The walkway. Stain is still a bit wet.
|
|
|
|
A veiw of the finished bridge taken from the fruit tree side.
|
|
|